Ferrier Point Canning Town

WhatsApp Image 2020-09-01 at 13.23.16.jpeg
original block before it was striped

Original block before it was striped

The block was then stripped following a report commissioned by Newham Council.

The block was then stripped following a report commissioned by Newham Council.

then block was then re insulated with Rockwool duo slab and new EWI system from Wetherby Building systems installed along with SideRise intermittent fire barrier

The tower block was re insulated with Rockwool duo slab and new EWI system from Wetherby Building systems installed along with SideRise intermittent fire barrier

a suitable floor to sky colour palette was chosen

A suitable floor to sky colour palette was chosen

the new A1 Rated Vitradual cladding and Weatherby Silicone finishes were applied

The new A1 Rated Vitradual cladding and Weatherby Silicone finishes were applied

then the unthinkable happened

Couple of months after we completed the recladding one of the flats got on fire.

as you can see the flat was completely burnt out both the cladding and the EWI stopped the spread of flame at the correctly installed fire breaks showing full compliance to its A1 status

As you can see the flat was completely burnt out both the new cladding and the EWI stopped the spread of flame at the correctly installed fire breaks showing full compliance to its A1 status